The key to preventing cost overruns is in knowing the reasons why cost overruns happen and having the ability to recalibrate a project before it becomes over budget, behind schedule, and beyond recovery.
Unfortunately, it has become the norm that construction projects will be over budget and behind schedule. However, the reality should be the opposite.
It should not be acceptable or even expected that a construction project, regardless of size is going to result in cost overruns and schedule stretching.
My goal with this post is to provide real insight into how you can prevent cost overruns from ruining your project. It’s important that you and your colleagues understand the trickle-down impacts that cost overruns have on your company, your community, and your relationships with key project stakeholders.
It’s critical that you work with an independent party like, Construction Check™ to ensure that your construction project is feasible. Rely on Construction Check™ to do a thorough cost estimation, to take a deep dive on every line item – be confident that before you start digging that your project can be completed on-budget, and on-scope.
A cost overrun happens when a project incurs unexpected and unanticipated costs. These costs are in excess of the planned budget.
Cost overruns are often referred to as a cost increase or as an underrated or budget overrun. Regardless of the term, the reality is that the construction project has exceeded its planned budget and is likely behind schedule as well.
In its 2017 Global Construction Survey, KPMG revealed that only 31% of projects surveyed over a 3-year period came within 10% of the estimated budget.
This is a challenging number, one that is hurting communities and its citizens who are impacted by the long-term effects of cost overruns and schedule delays.
Cost overruns happen as a result of a series of missteps that result in inadequate planning, scheduling, cost estimating, and project oversight.
“A capital project is rarely derailed by a single problem; it usually takes a series of failed steps along the way to put a project in jeopardy,” says Daryl Walcroft, PwC US Capital Projects & Infrastructure partner.
“And often the blame can be spread among the owners, designers, and building contractors.” (Correcting the course of capital projects, PwC)
In an April 2013 PwC article, Walcroft further emphasized that owners can be unrealistic in their expectations; contractors, misleading in their progress reports; and architects prone to errors and delays in their designs. Further complicating matters, they all may fail to communicate effectively.
To help emphasize these points made by Walcroft, it’s important to understand why cost overruns occur:
The impacts of cost overruns run deep – impacting key company stakeholders, company employees, governments, and the very communities the project was supposed to serve. Along with this is the lack of trust citizens have in their government’s ability to manage future construction projects.
The reality is that there is only so much money. When a project runs into issues with planning, scheduling, oversight, and front-end review – the money to make up for these errors has to come from somewhere.
Consider my very personal experience with the impact of cost overruns: over a decade ago, the family church of my mother had to abandon its construction plan – all because the costs were not correctly estimated upfront.
This is why it has become my mission to protect construction clients and their interests.
This only happens when you work with an independent capital cost advisor. Trust in Construction Check™ to independently and objectively quantify the complex relationship between ideas, architecture, engineering and construction.
Construction Check™ does this at the start of the project to eliminate big problems at the end. Big problems that cost everyone in the short- and long-term.
Contact us to learn more about the Construction Check™ mission to Improve Cost Certainty™
in the construction industry and how we can help you prevent cost overruns and project failure.